The Skid-mounted LNG Vehicle Refueling Station is an integrated equipment solution for LNG vehicle refueling projects. It combines LNG unloading, storage tank pressurization, cryogenic transfer and vehicle dispensing processes within a skid-mounted layout. With integrated process equipment and two unloading options, the system provides a consolidated configuration for LNG station investors, operators and EPC contractors seeking to simplify equipment installation and adapt the fueling process to project requirements.
|
|
|
|
|
TY-LNG |
|
|
60 m³ |
|
|
10,000–150,000 kg |
|
|
<=0.05 kW/kg |
|
|
<=2 hours |
|
|
>=92% |
|
|
Skid-mounted |
|
|
4.2 × 2.3 × 2.5 m |
|
|
22 kW |
The TY-LNG station integrates the main process equipment for LNG unloading, storage tank pressurization and vehicle refueling. Its main configuration includes:
Self-Pressurized Unloading
A vaporizer-based pressure-building process creates the pressure difference needed to transfer LNG from the tanker into the station storage tank. This method uses the tanker's pressure-building process rather than a cryogenic unloading pump to drive LNG transfer.
Pump-Assisted Unloading
A cryogenic pump provides the transfer pressure required to move LNG from the tanker into the station storage tank, supporting pump-driven unloading operations.
The unloading arrangement can be selected according to project requirements and the specified equipment configuration. After unloading, the system supports storage tank pressurization, temperature regulation and LNG vehicle refueling through its integrated process layout.
Main cryogenic process pipelines use vacuum-insulated piping, with vacuum flanges at key connections. This design reduces external heat ingress during LNG transfer, helping maintain low-temperature conditions and limit unwanted vaporization within the piping system.
The PLC control system coordinates operating functions and pneumatic shut-off valves during LNG unloading, storage tank pressurization and vehicle refueling. Centralized control simplifies process operation, reduces frequent manual valve handling and helps operators manage the main station functions.
The main process equipment, pipelines and control valves are arranged on a common skid. This factory-integrated layout reduces the amount of on-site equipment assembly and pipeline coordination, helping simplify installation planning and project implementation.
Qingdao Lenado provides engineering and configuration support to adapt LNG refueling equipment to different project requirements and site conditions.
These services support equipment selection, site preparation and technical coordination for LNG station investors and EPC contractors.
Manufacturing Qualifications and After-Sales Support
Qingdao Lenado specializes in the R&D, manufacturing and supply of natural gas and LNG equipment. Its manufacturing capabilities include CNC production and processing equipment, supported by a professional R&D team and a quality management system.
The company holds ISO 9001 certification, a special equipment manufacturing license and product explosion-proof qualifications. Its technical portfolio also includes 21 product patents and more than 80 technologies with independent intellectual property rights.
After-sales support includes:
• 12-month product warranty and lifetime maintenance support
• On-site commissioning and operator training
• 24-hour online customer service
Etiquetes populars: skid-mounted LNG vehicle refueling station, China skid-mounted LNG vehicle refueling station manufacturers, factory